Welcome To Clifton Park Water Authority’s New WebsiteRead What’s New

Irrigation Systems

A property owner or installer must apply for and obtain a CPWA permit before installing an underground lawn irrigation system and must pay the applicable permit fee.

CPWA irrigation rules effective September 1, 2024: all new construction must have metered water service before an irrigation system is installed. The connection must be made in an interior location protected from freezing, downstream of the water meter and main check valve. Systems must use a time clock capable of complying with CPWA lawn-watering restrictions.

Rules & Regulations

View Lawn Irrigation Rules & Regulations

Application for Irrigation Systems

The property owner or installer must submit this application before installation.